DUNG PHONG INDUSTRIAL CLUSTER · DEVELOPED BY JADE - GENTLE - BUILD
(+84) 996 663 979cskh@jadegentlebuild.com
English
Industrial Cluster · Under Development

Dung Phong Industrial Cluster

An industrial development site in Hoa Binh, designed to connect manufacturing needs with integrated infrastructure. The project covers 75 ha and aims to attract manufacturing, processing and supporting industries. JGB wo…

Aerial 3D rendering of Dung Phong Industrial Cluster
Muong Thang Commune, Phu Tho Province.
DEVELOPED BY JADE - GENTLE - BUILDLand ready for your factory.
Explore the project
75 ha

Project area

from 1000 m²

Area Available for Lease

start at 95$/ m²

Land Lease Rate

Until 2076

Lease Term

A foundation for
your development plans.

An industrial development site in Hoa Binh, designed to connect manufacturing needs with integrated infrastructure.

The project covers 75 ha and aims to attract manufacturing, processing and supporting industries. JGB works with businesses to explore the location, site layout options and infrastructure requirements.

Contact the JGB team for the latest project information and to arrange an on-site visit.

Project Information
ProjectDung Phong Industrial Cluster
LocationMuong Thang Commune, Phu Tho Province.
Site Area75 ha
Development StatusUnder Development
Project DeveloperJade - Gentle - Build Joint Stock Company
Area Available for Leasefrom 1000 m²
Land Lease Ratestart at 95$/ m²
Lease TermUntil 2076
Expected WorkforceApproximately 7,500 people
Total Investment under the Investment Policy ApprovalVND 738.75 billion
Total Investment Submitted for Feasibility Study AppraisalVND 862.462 billion
Project ScheduleInvestment procedures: 2025–2027; investment implementation and commencement of operations: 2027–2029

Connected to
opportunities for growth.

Cụm công nghiệp Dũng Phong nằm tại xã Mường Thàng, tỉnh Phú Thọ; địa danh trước khi sắp xếp đơn vị hành chính là xã Dũng Phong, huyện Cao Phong, tỉnh Hòa Bình. Khu vực quy hoạch có diện tích 56,52 ha, tiếp giáp đường tỉnh ĐT.444, đường tránh Quốc lộ 6 và suối Cái.yy

Planning boundary, about 57,46 ha. 42 plots, 42 of them available.

Distances

  • Provincial Road DT.444Directly adjoining the site
  • National Highway 6 bypassAdjoining the site under the planned layout
  • Hoa Binh city centreApproximately 20 km
  • Hanoi city centreApproximately 90 km
  • Noi Bai International AirportApproximately 120 km
Book a Site Visit

Thorough planning.
Flexible site layouts.

The 1:500 detailed plan for Dung Phong Industrial Cluster covers 56.52 ha, with an expected workforce of approximately 7,500 people.

The site is organised into key functional areas: service and administration facilities; land for industrial production, small-scale industry and warehousing; public green spaces; specialised and buffer green spaces; utility infrastructure; parking; and a landscaped lake.

Infrastructure is developed as an integrated system, connecting to Provincial Road DT.444, the National Highway 6 bypass and the main arterial road of the Dung Phong urban area.

Factories and manufacturing buildings in the production area may have a maximum of five storeys, with a maximum building coverage ratio of 60%. A green buffer at least 10 m wide surrounds the industrial cluster.

Need the detailed planning drawings?

Request the site layout documents and discuss factory layout options with the JGB team.

Request Planning Documents

The right infrastructure.
Efficient operations.

The main infrastructure components of Dung Phong Industrial Cluster are outlined below. The JGB team is available to clarify detailed specifications according to each business's needs.

01

Roads

Connections to Provincial Road DT.444 and the National Highway 6 bypass. Internal roads comprise D0 at 17.5 m wide; D2 at 36 m; D1, N1 and N2 at 20.5 m; and a service road at 12 m.

02

Power Supply

Total planned capacity is approximately 10,832.67 kVA, with four transformer substations and 12 ring main units (RMUs) planned. The initial connection will be to the 35 kV grid on feeder 372 E10.1, with initial-phase capacity not exceeding 2,000 kVA. The subsequent phase will be supplied from the Cao Phong 110 kV substation under the plan to 2030.

03

Lighting

The 0.4 kV low-voltage network will run underground beneath the pavements. Lighting will be managed through an automatic lighting control cabinet.

04

Water Supply

A water supply station with a capacity of approximately 1,800 m³ per day will be built. Water sources will combine raw water from Cai Stream with the local centralised water supply system. The network will use HDPE pipes in sizes D160–D250.

05

Stormwater Drainage

A separate gravity-flow system divided into three drainage catchments, using reinforced concrete pipes in sizes D600–D1500 and discharging to the landscaped lake and Cai Stream.

06

Wastewater Collection & Treatment

A wastewater system separate from stormwater drainage, using D300–D400 pipes. The centralised treatment plant will have a capacity of 1,200 m³ per day, with an emergency holding pond of approximately 3,600 m³. Treated water must meet environmental requirements before discharge into Cai Stream.

07

Telecommunications

Underground installation beneath the pavements, with HDPE D130/100 ducts provided. Estimated total demand is approximately 2,924 subscriber lines.

08

Fire Protection

An outdoor firefighting water network with a design flow of 30 litres per second for one fire, with fire hydrants installed on the water supply network.

09

Green Spaces & Landscaping

A landscaped lake of 11,699.32 m². Specialised green spaces account for 11.86%, providing a buffer at least 10 m wide around the industrial cluster.

Space for a wide range
of manufacturing industries.

JGB works with businesses to assess how their industry and site requirements align with the project's development direction.

Discuss Your Manufacturing Requirements

Garment manufacturing — division 14

  • 14100 Manufacture of wearing apparel, except fur apparel
  • 14300 Manufacture of knitted and crocheted apparel

Agricultural product and food processing — divisions 10, 12

  • 10101 Slaughtering of livestock and poultry
  • 10102 Processing and preserving of meat
  • 10109 Processing and preserving of meat products
  • 10201 Processing and preserving of frozen aquatic products
  • 10202 Processing and preserving of dried aquatic products
  • 10203 Processing and preserving of fish sauce
21 more industries
  • 10209 Processing and preserving of other aquatic products
  • 10301 Manufacture of fruit and vegetable juices
  • 10309 Other processing and preserving of fruit and vegetables
  • 10401 Manufacture of animal oils and fats
  • 10402 Manufacture of vegetable oils and fats
  • 10500 Manufacture of dairy products
  • 10612 Manufacture of coarse flour
  • 10620 Manufacture of starches and starch products
  • 10710 Manufacture of bakery products
  • 10720 Manufacture of sugar
  • 10730 Manufacture of cocoa, chocolate and confectionery
  • 10740 Manufacture of macaroni, noodles and similar products
  • 10751 Manufacture of prepared meals and dishes from meat
  • 10752 Manufacture of prepared meals and dishes from aquatic products
  • 10759 Manufacture of other prepared meals and dishes
  • 10760 Processing of tea
  • 10770 Processing of coffee
  • 10790 Manufacture of other food products n.e.c.
  • 10800 Manufacture of livestock, poultry and aquaculture feed
  • 12001 Manufacture of cigarettes
  • 12009 Manufacture of other tobacco products

Wood processing and furniture manufacturing — divisions 16, 31

  • 16101 Sawmilling and planing of wood
  • 16102 Preservation of wood
  • 16210 Manufacture of plywood, veneer sheets and other panels and boards
  • 16220 Manufacture of builders' carpentry and joinery
  • 16230 Manufacture of wooden containers
  • 16291 Manufacture of other products of wood
3 more industries
  • 31010 Manufacture of wooden furniture
  • 31020 Manufacture of metal furniture
  • 31090 Manufacture of furniture of other materials

Metalworking, machinery and equipment repair and installation — divisions 25, 33

  • 25110 Manufacture of structural metal products
  • 25120 Manufacture of metal tanks, reservoirs and containers
  • 25130 Manufacture of steam generators, except central heating boilers
  • 25920 Machining; treatment and coating of metals
  • 25930 Manufacture of cutlery, hand tools and general hardware
  • 25991 Manufacture of metal kitchen, sanitary and table ware
8 more industries
  • 25999 Manufacture of other fabricated metal products n.e.c.
  • 33110 Repair and maintenance of fabricated metal products
  • 33120 Repair and maintenance of machinery and equipment
  • 33130 Repair and maintenance of electronic and optical equipment
  • 33140 Repair and maintenance of electrical equipment
  • 33150 Repair and maintenance of transport equipment, except motor vehicles and motorcycles
  • 33190 Repair and maintenance of other equipment
  • 33200 Installation of industrial machinery and equipment

Electronics, optical products and measuring instruments — division 26

  • 26190 Manufacture of other electronic components
  • 26200 Manufacture of computers and peripheral equipment
  • 26300 Manufacture of communication equipment
  • 26400 Manufacture of consumer electronics
  • 26510 Manufacture of measuring, testing, navigating and control equipment
  • 26520 Manufacture of watches and clocks
3 more industries
  • 26600 Manufacture of irradiation, electromedical and electrotherapeutic equipment
  • 26700 Manufacture of optical instruments and photographic equipment
  • 26800 Manufacture of magnetic and optical media

Beer, wine, spirits and soft drinks — division 11

  • 11010 Distilling, rectifying and blending of spirits
  • 11020 Manufacture of wines
  • 11030 Manufacture of beer
  • 11040 Manufacture of malt
  • 11051 Production of bottled mineral and purified water
  • 11052 Manufacture of soft drinks

Handicrafts: rattan and bamboo ware, jewellery — divisions 16, 32

  • 16292 Manufacture of articles of forest products (except wood), sedge and plaiting materials
  • 32110 Manufacture of jewellery and related articles
  • 32120 Manufacture of imitation jewellery and related articles

Medical devices, sports goods, toys and other manufacturing — division 32

  • 32200 Manufacture of musical instruments
  • 32300 Manufacture of sports goods
  • 32400 Manufacture of games and toys
  • 32501 Manufacture of medical and dental instruments and supplies
  • 32502 Manufacture of orthopaedic and rehabilitation appliances
  • 32900 Other manufacturing n.e.c.

Water supply, drainage and wastewater treatment — divisions 36, 37

  • 36000 Water collection, treatment and supply
  • 37001 Drainage
  • 37002 Wastewater treatment

Dung Phong Industrial Cluster · 26/11/2026 · cumcongnghiepdungphong.vn

Estimate your
lease costs.

Enter the area and what you expect to use to estimate the cost of leasing at this project. Anything the developer has not yet published is marked as such, not guessed.

Your details

Minimum 1,000 m²

Estimated cost

Prices are negotiable. Contact JGB for a quotation suited to your business.

Clear information.
A foundation for decisions.

Current Development StatusUnder Development
Documentation Status as at 24 April 2026The industrial cluster has been established; investment policy approval, the 1:500 detailed plan and the Environmental Impact Assessment have been approved; power supply approval in principle has been obtained; and the feasibility study appraisal has been completed.
Establishment of the Industrial ClusterDecision No. 1786/QĐ-UBND dated 27 June 2025, issued by the Hoa Binh Provincial People's Committee, on the establishment of Dung Phong Industrial Cluster.
Investment Policy ApprovalDecision No. 168/QĐ-UBND dated 28 June 2025, issued by the Hoa Binh Provincial People's Committee; total investment of VND 738.75 billion.
1:500 Detailed PlanDecision No. 1061/QĐ-UBND dated 26 November 2025, issued by the Muong Thang Commune People's Committee; site area of 565,218.32 m², equivalent to 56.52 ha.
List of Projects Requiring Land RecoveryResolution No. 61/NQ-HĐND dated 10 December 2025, issued by the Phu Tho Provincial People's Council, and the accompanying project list.
Drainage AgreementDocument No. 342/SNN&MT-TL dated 14 January 2026, issued by the Department of Agriculture and Environment.
Power Supply Approval in PrincipleDocument No. 93/KVCPPT-KHKTAT dated 28 January 2026, issued by the Cao Phong Area Power Management Team.
Environmental Impact Assessment ApprovalDecision No. 1126/QĐ-UBND dated 10 April 2026, issued by the Phu Tho Provincial People's Committee.
Feasibility Study AppraisalDocument No. 4147/SXD-PTĐT dated 24 April 2026, issued by the Phu Tho Department of Construction. The documentation substantially meets the requirements and is eligible for submission for approval and progression to the next steps.
Project ScheduleInvestment procedures: 2025–2027; investment implementation and commencement of operations: 2027–2029.

Project Documents 6

Public documents can be viewed straight away. Detailed documents are released to businesses after requesting the document package — it takes about a minute.

  • Decision No. 1126/QĐ-UBND of 10 April 2026 of the Chairman of the Phu Tho Provincial People’s Committee approving the appraisal results of the Environmental Impact Assessment reportPDF · 930 KB · Released after you request them
    Request This Document
  • Letter No. 4147/SXD-PTĐT of 24 April 2026 of the Phu Tho Department of Construction on the appraisal results of the construction investment feasibility studyPDF · 620 KB · Released after you request them
    Request This Document
  • Letter No. 93/KVCPPT-KHKTAT of 28 January 2026 of the Cao Phong Area Power Management Team approving in principle the power supply for the projectPDF · 565 KB · Released after you request them
    Request This Document
  • Resolution No. 61/NQ-HĐND of 10 December 2025 of the Phu Tho Provincial People’s Council approving the list of projects requiring land recovery in Phu Tho ProvincePDF · 1,8 MB · Released after you request them
    Request This Document
  • Decision No. 1061/QĐ-UBND of 26 November 2025 of the Muong Thang Commune People’s Committee approving the 1/500 Detailed Plan of Dung Phong Industrial ClusterPDF · 562 KB · Released after you request them
    Request This Document
  • Notice No. 22/TB-BQL of 23 October 2026 of the Muong Thang Commune Project Management Board on the time and place of compensation, support and resettlement payments (Rounds 1 and 2)PDF · 694 KB · Released after you request them
    Request This Document
Request the complete project document package

Provide your company details to access all documents and receive support from a JGB specialist.

Request Project Documents

News from
the site.

Legal progress, infrastructure and development milestones of Dung Phong Industrial Cluster, updated by JGB.

All Articles

Start with
a conversation.

Request the documents to explore the project in detail, or book a site visit to see its location and infrastructure first-hand.

Project Developer

Jade - Gentle - Build.
A long-term partner.

Jade - Gentle - Build develops industrial real estate projects to a high standard, providing reliable infrastructure for business investment, manufacturing and expansion.

About JGB