Roads
Connections to Provincial Road DT.444 and the National Highway 6 bypass. Internal roads comprise D0 at 17.5 m wide; D2 at 36 m; D1, N1 and N2 at 20.5 m; and a service road at 12 m.
An industrial development site in Hoa Binh, designed to connect manufacturing needs with integrated infrastructure. The project covers 75 ha and aims to attract manufacturing, processing and supporting industries. JGB wo…

Project area
Area Available for Lease
Land Lease Rate
Lease Term
An industrial development site in Hoa Binh, designed to connect manufacturing needs with integrated infrastructure.
The project covers 75 ha and aims to attract manufacturing, processing and supporting industries. JGB works with businesses to explore the location, site layout options and infrastructure requirements.
Contact the JGB team for the latest project information and to arrange an on-site visit.
| Project | Dung Phong Industrial Cluster |
|---|---|
| Location | Muong Thang Commune, Phu Tho Province. |
| Site Area | 75 ha |
| Development Status | Under Development |
| Project Developer | Jade - Gentle - Build Joint Stock Company |
| Area Available for Lease | from 1000 m² |
| Land Lease Rate | start at 95$/ m² |
| Lease Term | Until 2076 |
| Expected Workforce | Approximately 7,500 people |
| Total Investment under the Investment Policy Approval | VND 738.75 billion |
| Total Investment Submitted for Feasibility Study Appraisal | VND 862.462 billion |
| Project Schedule | Investment procedures: 2025–2027; investment implementation and commencement of operations: 2027–2029 |
Cụm công nghiệp Dũng Phong nằm tại xã Mường Thàng, tỉnh Phú Thọ; địa danh trước khi sắp xếp đơn vị hành chính là xã Dũng Phong, huyện Cao Phong, tỉnh Hòa Bình. Khu vực quy hoạch có diện tích 56,52 ha, tiếp giáp đường tỉnh ĐT.444, đường tránh Quốc lộ 6 và suối Cái.yy

The 1:500 detailed plan for Dung Phong Industrial Cluster covers 56.52 ha, with an expected workforce of approximately 7,500 people.
The site is organised into key functional areas: service and administration facilities; land for industrial production, small-scale industry and warehousing; public green spaces; specialised and buffer green spaces; utility infrastructure; parking; and a landscaped lake.
Infrastructure is developed as an integrated system, connecting to Provincial Road DT.444, the National Highway 6 bypass and the main arterial road of the Dung Phong urban area.
Factories and manufacturing buildings in the production area may have a maximum of five storeys, with a maximum building coverage ratio of 60%. A green buffer at least 10 m wide surrounds the industrial cluster.
Request the site layout documents and discuss factory layout options with the JGB team.
The main infrastructure components of Dung Phong Industrial Cluster are outlined below. The JGB team is available to clarify detailed specifications according to each business's needs.
Connections to Provincial Road DT.444 and the National Highway 6 bypass. Internal roads comprise D0 at 17.5 m wide; D2 at 36 m; D1, N1 and N2 at 20.5 m; and a service road at 12 m.
Total planned capacity is approximately 10,832.67 kVA, with four transformer substations and 12 ring main units (RMUs) planned. The initial connection will be to the 35 kV grid on feeder 372 E10.1, with initial-phase capacity not exceeding 2,000 kVA. The subsequent phase will be supplied from the Cao Phong 110 kV substation under the plan to 2030.
The 0.4 kV low-voltage network will run underground beneath the pavements. Lighting will be managed through an automatic lighting control cabinet.
A water supply station with a capacity of approximately 1,800 m³ per day will be built. Water sources will combine raw water from Cai Stream with the local centralised water supply system. The network will use HDPE pipes in sizes D160–D250.
A separate gravity-flow system divided into three drainage catchments, using reinforced concrete pipes in sizes D600–D1500 and discharging to the landscaped lake and Cai Stream.
A wastewater system separate from stormwater drainage, using D300–D400 pipes. The centralised treatment plant will have a capacity of 1,200 m³ per day, with an emergency holding pond of approximately 3,600 m³. Treated water must meet environmental requirements before discharge into Cai Stream.
Underground installation beneath the pavements, with HDPE D130/100 ducts provided. Estimated total demand is approximately 2,924 subscriber lines.
An outdoor firefighting water network with a design flow of 30 litres per second for one fire, with fire hydrants installed on the water supply network.
A landscaped lake of 11,699.32 m². Specialised green spaces account for 11.86%, providing a buffer at least 10 m wide around the industrial cluster.
JGB works with businesses to assess how their industry and site requirements align with the project's development direction.
Discuss Your Manufacturing RequirementsNo matching industry in the list. Contact JGB to discuss your case.
The boxes are arranged with reference to the priority industry groups in Decision No. 1786/QĐ-UBND of 27 June 2025 of the Hoa Binh (now Phu Tho) Provincial People’s Committee establishing Dung Phong Industrial Cluster. The list itself is set by Decision No. 1126/QĐ-UBND of 10 April 2026 of the Chairman of the Phu Tho Provincial People’s Committee approving the appraisal of the environmental impact assessment report; codes follow the Vietnam Standard Industrial Classification (Decision No. 36/2025/QĐ-TTg). The cluster accepts only secondary investment projects in the industries listed; each tenant carries out the environmental procedures for its own project and pre-treats its wastewater to the required standard before connecting to the centralised wastewater treatment system.
Dung Phong Industrial Cluster · 26/11/2026 · cumcongnghiepdungphong.vn
Enter the area and what you expect to use to estimate the cost of leasing at this project. Anything the developer has not yet published is marked as such, not guessed.
Prices are negotiable. Contact JGB for a quotation suited to your business.
A JGB adviser will email you the detailed estimate and contact you within one working day.
This is an estimate for reference only, not a quotation or an offer to contract. Actual costs follow the lease contract and the price list the developer publishes when it is signed.
| Current Development Status | Under Development |
|---|---|
| Documentation Status as at 24 April 2026 | The industrial cluster has been established; investment policy approval, the 1:500 detailed plan and the Environmental Impact Assessment have been approved; power supply approval in principle has been obtained; and the feasibility study appraisal has been completed. |
| Establishment of the Industrial Cluster | Decision No. 1786/QĐ-UBND dated 27 June 2025, issued by the Hoa Binh Provincial People's Committee, on the establishment of Dung Phong Industrial Cluster. |
| Investment Policy Approval | Decision No. 168/QĐ-UBND dated 28 June 2025, issued by the Hoa Binh Provincial People's Committee; total investment of VND 738.75 billion. |
| 1:500 Detailed Plan | Decision No. 1061/QĐ-UBND dated 26 November 2025, issued by the Muong Thang Commune People's Committee; site area of 565,218.32 m², equivalent to 56.52 ha. |
| List of Projects Requiring Land Recovery | Resolution No. 61/NQ-HĐND dated 10 December 2025, issued by the Phu Tho Provincial People's Council, and the accompanying project list. |
| Drainage Agreement | Document No. 342/SNN&MT-TL dated 14 January 2026, issued by the Department of Agriculture and Environment. |
| Power Supply Approval in Principle | Document No. 93/KVCPPT-KHKTAT dated 28 January 2026, issued by the Cao Phong Area Power Management Team. |
| Environmental Impact Assessment Approval | Decision No. 1126/QĐ-UBND dated 10 April 2026, issued by the Phu Tho Provincial People's Committee. |
| Feasibility Study Appraisal | Document No. 4147/SXD-PTĐT dated 24 April 2026, issued by the Phu Tho Department of Construction. The documentation substantially meets the requirements and is eligible for submission for approval and progression to the next steps. |
| Project Schedule | Investment procedures: 2025–2027; investment implementation and commencement of operations: 2027–2029. |
Public documents can be viewed straight away. Detailed documents are released to businesses after requesting the document package — it takes about a minute.
Provide your company details to access all documents and receive support from a JGB specialist.
Legal progress, infrastructure and development milestones of Dung Phong Industrial Cluster, updated by JGB.
All ArticlesOn 13 November 2026, Jade - Gentle - Build Joint Stock Company attended the 2026 Conference on Policy and Law for the Management a…
Read ArticlePursuant to Decision No. 1479/QĐ-UBND of 11 September 2026 and Decision No. 1519/QĐ-UBND of 25 September 2026 of the Muong Thang C…
Read ArticleOn 14 October 2026, Dung Phong Industrial Cluster in Muong Thang Commune, Phu Tho Province, began surveying and preparing the cons…
Read ArticleAs environmental protection and greenhouse gas reduction receive more and more attention, choosing a factory location is no longer…
Read ArticleWhen choosing land for a factory, a business needs to know more than how far the project is from Hanoi. What matters more is how t…
Read ArticleOn 3 October 2026, work on the power supply for Dung Phong Industrial Cluster continued in line with the project’s technical infra…