What stands out about Dung Phong Industrial Cluster is its access to National Road 6 via Provincial Road 444. This connection lets businesses ship towards Hanoi as well as towards Son La and Dien Bien, depending on the supply sources and markets of each type of production.
THE PROJECT’S LOCATION ON THE ROAD 444 – NATIONAL ROAD 6 AXIS
Dung Phong Industrial Cluster is in Muong Thang Commune, Phu Tho Province, formerly Dung Phong Commune, Cao Phong District, Hoa Binh Province. Phase 1 of the project covers 56.52 ha under the approved 1/500 Detailed Plan.
The project connects directly to Provincial Road 444 and from there to National Road 6. On this route, each direction serves a different market and different transport needs:
- Towards Hanoi: vehicles pass through the former Hoa Binh city, then join the Hoa Lac – Hoa Binh road and Thang Long Avenue into Hanoi; or continue along National Road 6 through Luong Son, Xuan Mai and Ba La.
- Towards Son La and Dien Bien: in the other direction, National Road 6 runs through Tan Lac and Mai Chau and on to Son La and Dien Bien.
These two directions give businesses more options for bringing raw materials to the factory and distributing products to different markets.
WHAT DOES THIS MEAN FOR A FACTORY IN DUNG PHONG?
The value of a two-way connection is clearest in a business’s day-to-day operations. If its suppliers, materials or customers are concentrated in Hanoi and the north, the business has a clear route from the factory to Hoa Binh and Hanoi and back. If its raw materials, customers or distribution network are in Son La or Dien Bien, National Road 6 provides the route in the other direction.
For production models whose inputs and outputs are in two different regions, this location is even more interesting. Raw materials can be brought from Son La and Dien Bien to the factory, and finished goods then shipped to Hoa Binh and Hanoi. Or the other way round: supplies from the Hanoi side come to the factory for production, and products are distributed towards Son La and Dien Bien. This lets a business judge a factory location against its whole supply chain rather than its distance to a single market.
CONNECTIONS STRENGTHENED BY PLANNED AND ONGOING INFRASTRUCTURE
Alongside the existing Road 444 and National Road 6, the area around Dung Phong Industrial Cluster also has roads being planned or under construction.
Under the 1/500 Detailed Plan, the service area, with the management building and fire-fighting facilities, sits where Road 444, the National Road 6 bypass and the Dung Phong urban main road meet. This gives the service and management facilities easy access to the area’s main roads. The National Road 6 bypass has a planned cross-section of 60 m.
On a wider scale:
- The Hoa Lac – Hoa Binh road is already in use, and this section is planned to be widened to a 6-lane expressway.
- The Ba La – Xuan Mai section of National Road 6 is being upgraded, with the aim of technical opening to traffic before the 2027 Lunar New Year.
- Construction and site clearance for the Hoa Binh – Moc Chau expressway are being accelerated.
These are factors businesses can follow when assessing the area’s connections over the medium and long term, alongside the roads already in use today. From its current location to its future connections, Dung Phong Industrial Cluster offers manufacturers something worth weighing: a factory with access not only to Hanoi but also to a route on to Son La and Dien Bien.